the BiVeS framework
When you’ve cloned the source code:
git clone https://github.com/SemsProject/BiVeS
There are two supported options to build this project:
Maven is a build automation tool. We ship a [source:pom.xml pom.xml] together with the sources which tells maven about versions and dependencies. Thus, maven is able to resolve everything on its own and, in order to create the library, all you need to call is mvn package:
usr@srv $ mvn package
-------------------------------------------------------
T E S T S
-------------------------------------------------------
Running de.unirostock.sems.bives.test.general.GeneralTest
Tests run: 3, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 1.92 sec
Running de.unirostock.sems.bives.test.general.CommandLineTest
Tests run: 3, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 1.008 sec
Running de.unirostock.sems.bives.test.sysmoseek.ManchesterTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 0.23 sec
Running de.unirostock.sems.bives.test.upstream.XmlTest
Tests run: 1, Failures: 0, Errors: 0, Skipped: 0, Time elapsed: 1.151 sec
Results :
Tests run: 8, Failures: 0, Errors: 0, Skipped: 0
That done, you’ll find the binaries in the target directory.
Ant is an Apache tool for automating software build processes. There is a [source:build.xml build.xml] file included in the source code that tells ant what to do. Since ant is not able to resolve the dependencies you need to create a directory lib containing the following libraries:
We defined multiple targets in the build.xml. They can be displayed by calling ant -p:
usr@srv $ ant -p
Buildfile: /path/to/BiVeS/build.xml
A toolkit useful for working with XML documents
Main targets:
clean clean up
compile compile the source
dist generate the distribution
init initialize workspace
sign sign a dist
Default target: dist
clean up will delete all compiled files and produced librariescompile compiles the source codedist bundles all compiled binaries into a jar packageFor example, to create the jar library just run ant dist:
usr@srv $ ant dist
Buildfile: /path/to/BiVeS/build.xml
init:
compile:
[javac] Compiling 3 source files to .../BiVeS/build
dist:
[jar] Building jar: .../BiVeS/dist/BiVeS-1.2.7.jar
[jar] Building jar: .../BiVeS/dist/BiVeS-1.2.7-fat.jar
BUILD SUCCESSFUL
Total time: 7 seconds